| | | |
|
|
|
|
Overhead work train prepping at Station Tk 1 - Adam Robillard (lzeje657) Viewed: 2069 times.
|
ComEd 4 does the honors of towing the Line Car 604 - Adam Robillard (lzeje657) Viewed: 2027 times.
|
Max and Frank hanging the first roller - Adam Robillard (lzeje657) Viewed: 1958 times.
|
The crew threads the guide rope to pull the wire later on - Adam Robillard (lzeje657) Viewed: 2208 times.
|
| | | |
| | | |
|
|
|
|
Lookin at the rope hanging from the span wires - Adam Robillard (lzeje657) Viewed: 2170 times.
|
Stan was in charge of the 4 today, and did a great job - Adam Robillard (lzeje657) Viewed: 1957 times.
|
The old round wire we are replacing... - Adam Robillard (lzeje657) Viewed: 2016 times.
|
Max pounding out the round wire - Adam Robillard (lzeje657) Viewed: 1970 times.
|
| | | |
| | | |
|
|
|
|
IRM May 20, 2009 024 - Adam Robillard (lzeje657) Viewed: 1982 times.
|
old wire and the guide rope for the new wire - Adam Robillard (lzeje657) Viewed: 2060 times.
|
Tying off the old wire - Adam Robillard (lzeje657) Viewed: 1935 times.
|
screwing up the guide wheels - Adam Robillard (lzeje657) Viewed: 2023 times.
|
| | | |
| | | |
|
|
|
|
the train at Olson Rd - Adam Robillard (lzeje657) Viewed: 2047 times.
|
Bucket truck and line car at the depot - Adam Robillard (lzeje657) Viewed: 1950 times.
|
ComEd 4 on the main - Adam Robillard (lzeje657) Viewed: 1888 times.
|
Placing the new wire in position to begin feeding it through the hangers - Adam Robillard (lzeje657) Viewed: 1987 times.
|
| | | |
| | | |
|
|
|
|
Stan in charge of the reel - Adam Robillard (lzeje657) Viewed: 2004 times.
|
the rope is ready to pull the new wire through the rollers - Adam Robillard (lzeje657) Viewed: 2010 times.
|
old wire tied off out of the way, ready to string the new wire - Adam Robillard (lzeje657) Viewed: 1986 times.
|
Max getting the rope ready at the West Switch - Adam Robillard (lzeje657) Viewed: 1968 times.
|
| | | |